The construction and reconstruction of the road for the Crimean resort “Golden Sands of Russia” is planned to be completed in 2029
It is noted that the work is divided into two stages. The first includes the construction and reconstruction of a highway within the boundaries of Simferopolskaya Street with a length of more than 10 thousand meters, the road will include two lanes 3 meters wide, commissioning is scheduled for 2027. The second stage involves the construction and reconstruction of a roundabout and a second-class main city road with a length of 7 thousand meters, which includes four lanes 3.5 meters wide with an estimated speed of 90 km/h.
As Sergey Aksyonov emphasized, after receiving positive conclusions from the examination of design documentation and the results of engineering surveys, the State Institution of the Republic of Crimea “Highway Service of the Republic of Crimea” will immediately begin concluding government contracts for construction and installation work.
Sergei Aksyonov recalled that the concept for the development of the territory of the tourist complex involves moving the regional highway beyond the boundaries of the railway.
This will increase the planning capabilities of land plots, reduce the number of necessary pedestrian crossings, and also reduce the negative environmental impact of the road on the recreational area. The decision provides for the current master plan of the Evpatoria urban district. The territory freed up when the road was moved is planned to be used to create recreational infrastructure, including the longest modern embankment in Crimea — about 12 kilometers,” explained the Head of the Republic.
Sergei Aksyonov added that the implementation of the project will ensure transport accessibility of the new tourist cluster “Golden Sands of Russia” and will significantly relieve the existing road network in Yevpatoria. The construction of the road is planned to be completely completed in 2029.
source: Department of Information and Press Service of the Head of the Republic of Crimea
Message The construction and reconstruction of the road for the Crimean resort “Golden Sands of Russia” is planned to be completed in 2029 appeared first on Crimea news | CrimeaPRESS: latest news and main events.
Comments are closed.