The prosecutor's office of Sevastopol controlled the elimination of violations during the repair of the road and bridge in the village of Vishnevoe
CrimeaPRESS reports:
The prosecutor’s office of Sevastopol conducted an audit on the appeal of a local resident, received at a personal reception of the city prosecutor, on the repair of a highway on the street. Garden in with. Cherry.
Previously, the repair of this road was carried out by the contractor behind the deadlines. Due to the lack of effective control by the state customer, the prosecutor’s office of the city and the prosecutor’s office of the Nakhimovsky district submitted proposals to the Department of Transport and Road Infrastructure Development and the GKU «Directorate» to eliminate violations of the law, which were considered and satisfied. After the intervention of the prosecutor’s office, another contractor was involved in the repair.
Departure to the site found that at present the road has been paved with asphalt, roadsides have been equipped, lighting has been installed, there are necessary road signs and other means of organizing traffic, and the road bridge across the river has been reconstructed. Kacha, the river bed under it has been cleared— reports the press service of the Sevastopol prosecutor’s office.
In April of this year, employees of the prosecutor’s office of the city organized a meeting with a representative of an initiative group of local residents with officials from the Department of Transport and Road Infrastructure Development of the city of Sevastopol, GKU «Directorate» and the UGIBDD of the Ministry of Internal Affairs of Russia for the city of Sevastopol. The comments of citizens voiced during the meeting regarding ensuring the safe crossing of the bridge by pedestrians were fulfilled by the contractor.
The bridge is now free for traffic and pedestrians. The temporary bridge has been removed. Road lighting poles are connected to the mains.
Comments are closed.