A state contract has been concluded to carry out work on the construction of an eco-technopark in the Leninsky district of Crimea
CrimeaPRESS reports:
The state contract for construction and installation work at the facility “Ecotechnopark in the Leninsky district of Crimea with a capacity of 160 thousand tons” was concluded with the contractor “Russian Ecological Operator”. This was reported by the Ministry of Construction and Architecture of the Republic of Crimea.
The cost of the contract is about 2.8 billion rubles. In addition, a government contract was concluded with the Federal Autonomous Institution “Roskapstroy” to carry out construction control at the site.
The customer for the construction of the facility is an organization subordinate to the Ministry of Construction — the Main Directorate of Capital Construction of the Republic of Crimea.
The new complex will be designed for receiving solid municipal waste, sampling and grinding large-sized materials from the general flow of solid municipal waste, sorting, sampling and accumulation of secondary material resources, composting the organic fraction — “screenings” with accumulation. On the territory of the technology park it is planned to build a waste sorting complex, an administrative building and a car repair building.— said the Ministry of Construction of the Republic of Crimea.
Construction of the facility is scheduled to be completed by the end of 2024.
Crimea news | CrimeaPRESS: latest news and main events
Comments are closed.