About 8 billion rubles will be allocated for the implementation of the new national project “Infrastructure for Life” in Crimea
Krympress reports:
About 8 billion rubles are scheduled in 2025 for the implementation of the new national project “Infrastructure for Life” in the Republic of Crimea. This was announced in his Telegram channel by the head of the Republic of Crimea Sergey Aksyonov.
Thus, as part of the project, 77 public territories and places of mass recreation should be landscaped, including 7 territories in the cities of Armyansk, Krasnoperekopsk, Simferopol, Evpatoria, Kerch, Bakhchisarai and Yalta defined through the All -Russian vote for the selection of public areas for improvement.
According to Sergey Aksyonov, work will also continue to improve the local road network.
Contracts have already been concluded for 20 sections of roads with a total length of about 172 km and 6 artificial road structures with a length of more than 316 linear meters— said the head of Crimea.
In addition, this year work will begin to modernize the communal infrastructure, including the overhaul of the sections of three water drives and the reconstruction of the sewer pumping station in Alushta.
Sergei Aksyonov recalled that the new national project combines the tasks that since 2019 were solved as part of the national projects “Housing and the City Environment” and “Safe high -quality roads”.
During this period, 1.2 million square meters were commissioned. meters of residential premises. 432 public spaces were equipped, of which 72 — last year. 4 projects of the All-Russian competition of the best projects for creating a comfortable urban environment in small cities and historical settlements were implemented. This is a major overhaul of Sovetskaya Square in Yalta, the improvement of the White Mud resort park in Saki, Milyutinsky Park in Alupka and the overhaul of the coastal park in Shchelkino— notes the head of Crimea.
In addition, since 2019, 1,876 people from unsuitable for living have been resettled in Crimea; A street-road network with an aboveground pedestrian crossing across the bypass road in Simferopol was built; 239 sections of roads with a total length of more than 1.3 thousand kilometers were repaired; 49 artificial road structures with a total length of more than 2.2 thousand linear meters are brought into the normative state; 360 stationary photo and video recording cameras were installed to increase road safety.
Source: Information and press service of the Head of the Republic of Crimea
Crimea news | Krympress: Latest news and main events
Comments are closed.