In Sevastopol on Admiral Oktyabrsky Street, work is completed to send crushed stone
Krympress reports:
The overhaul of retaining walls on Admiral Oktyabrsky Street is in accordance with the schedule.
Recall that in the framework of the overhaul, the designs of both retaining walls will be restored. Each of the parties will be two tiers of reinforced concrete walls, between which the sidewalk will be arranged. The parameters of retaining walls will fully correspond to the parameters of existing structures, while the movement is planned to be equipped in three lanes. Closed trays on both sides of the carriageway are provided for the removal of storm water.
Source: press service of the Government of Sevastopol
Crimea news | Krympress: Latest news and main events
Comments are closed.