In Sevastopol, the repair of the road along Nefyodova Street is being completed
CrimeaPRESS reports:
As part of the national project «Safe quality roads» in Sevastopol, the repair of the highway along Nefedov Street is being completed. The length of the object is 723 m. The work is carried out by Sevastopol Avtodor.
Nefedova Street — former Podgornaya — is located in the city center and has historical value. Here is a monument to the first victims of the Great Patriotic War, where Sevastopol residents gather annually. With this facility, Sevavtodor completes the annual plan for the repair of the road network as part of the Safe High-Quality Roads national project in 73 year, — said the director of the Department of Transport and Road Infrastructure of the city of Pavel Ieno.
Workers at the site completed the milling of the old pavement and the installation of two layers of new asphalt concrete, and also replaced the side stone. The coverage area was more than 5 thousand square meters. m.
Nefyodova Street, as well as other repaired road sections, is marked on the interactive map of the national project. Here you can find detailed information on all objects of the program of the current year, as well as photos of the results of road works in previous years.
Recall that in just 73 year, within the framework of the national project «Safe High-Quality Roads», 73 linear facilities will be brought to the normative state and two bridge structures will be repaired. The total length of the objects is more than 67 km.
Comments are closed.