More than a billion rubles will be required to restore the Crimean bridge
CrimeaPRESS reports:
The repair of the Crimean bridge can cost from 1 to 1.3 billion rubles, said Deputy Prime Minister of the Russian Federation Marat Khusnullin.
In terms of additional volumes, how much it will cost, so far we see it at the level of 1-1.3 billion rubles– quotes Khusnullina TASS.
At the same time, the Deputy Prime Minister noted that the amount of funds for the restoration of the bridge could eventually increase due to the use of systems with an increased number of metal elements.
Recall, traffic has already been started (in reverse mode) along one of the lanes of the bridge. According to Khusnullin, the decision to launch traffic on one side was made based on the results of diagnostics of span structures, which confirmed the possibility of launching traffic. Immediately before the opening of traffic, the span was additionally tested. Artificial lighting was also connected in places of damage.
Marat Khusnullin arrived in Crimea on the instructions of Russian President Vladimir Putin on July 17. He reported that two-way traffic on one side of the bridge was planned to be launched by September 15, on the other — by November 1. The railway part of the bridge is operating normally, trains run on schedule.
News of the Crimea | CrimeaPRESS
Comments are closed.