On the Crimean bridge — large lines
Krympress reports:
The lines on the Crimean bridge stretched for several kilometers on both sides. Volunteers distribute water to drivers and passengers, traffic police officers regulate the transport flow and direct cars in the right lanes, the correspondent reports RIA Novosti Crimea.
Now is the waiting time for travel to the inspection points up to five hours.
According to our information, the car line from Crimea began to form from the turn to the village of Bagerovo. This is about 12 kilometers. On our part, maximum forces and means to ensure security and order on auto approaches are involved. We control the situation— RIA Novosti Crimea told employees of the Republican State traffic inspectorate.
In addition, volunteers work on the auto approaches, and motorists distribute water. The first point of delivery of the drinking is already open on the fifth kilometer of line.
There are enough water. How it will end, our assistants will give a few dozen packs. We distribute water in place. But people are suitable for themselves. We do not refuse anyone— the volunteers said.
The lines on the bridge began to form in the morning on Thursday, after it was blocked at night for security purposes. The movement was resumed at 7.45. Then, at 8.20, the bridge was again closed for more than an hour. As of 12.00, 3.5 thousand cars cost in lines on both sides.
The bridge is periodically closed for security reasons, the transport transition is a strategic object, its safety is of paramount importance. Military personnel, employees of law enforcement agencies and other structures responsible for the safety of the Crimean bridge are around the clock in complete combat readiness And they are ready to repel any attack.
On the Crimean bridge are valid Increased security measuresany vehicle and baggage are subject to verification. 110 inspection points on both sides of the transport transition were organized — all are involved at full capacity, so that the tourists go in line as quickly as possible.
In the days of peak loads, especially in the high season, large lines are built before the inspection complexes. According to forecasts for September, until four hours you will have to wait for travel along the Crimean bridge to those who plan a trip on September 1 and 2, 12 and 13. At the same time, in the early days of the month, traffic jams are expected from Tamani, and 12 and 13 on departure from Crimea.
You can also get to the Crimea from the mainland through the land corridor through the new regions of Russia. He is safe And provided with the necessary road infrastructure. There are also installed checkpoints where baggage and transport will be checked.
Crimea news | Krympress: Latest news and main events
Comments are closed.