Overhaul of the overpass on the Ship side of Sevastopol
CrimeaPRESS reports:
On the highway Hospital Descent on the Ship side of Sevastopol, a major overhaul of a 128-meter overpass is being carried out. Currently, work is being carried out on the construction of overpass supports, the reconstruction of engineering communications, pressure sewer networks. According to the contract, the overhaul is planned to be completed by the end of the year.
The contractor appointed to perform these works completed a set of measures to clear the right of way, lay out the main axes of the structure and arrange traffic management facilities. An important stage in the performance of major repairs is the creation of a temporary overpass, which ensures uninterrupted traffic. This engineering design allows vehicles and pedestrians to navigate safely and conveniently during maintenance work.— the press service of the Government of Sevastopol quotes the deputy director of the directorate for the development of road transport infrastructure Alexander Shiryaev.
In addition, repairs are being made to the bridge at the entrance to the village of Dalnee, on the Sturmovoe-Sakharnaya Lolovka highway. The repair of the bridge at the entrance to the village of Kacha has been completed.
All objects of the national project are plotted on an interactive map bkdrf.ru/map/sevastopolwhere detailed information is available on completed and planned works, as well as on roads that are currently being repaired.
News of the Crimea | CrimeaPRESS
Comments are closed.