Repair of the road from the village of Andreevka to the village of Solnechny began near Sevastopol
CrimeaPRESS reports:
As part of the Safe High-Quality Roads national project, the repair of the highway from the village of Andreevka to the village of Solnechnoye has started. Started work in January, plan to complete in August.
An annual instrumental diagnostics of the state of the road network was carried out, according to the results, the road was included in the repair program of the national project. The length of the road is 2.5 km, it is popular among both residents and guests, including because Andreevka has local natural attractions: capes Lukull and Tyubek , — the press service of the Government of Sevastopol quotes the deputy director Directorate for the Development of Road Transport Infrastructure Alexander Shiryaev.
Employees of the contractor Sevdorstroy are already milling the asphalt concrete pavement, installing side stones at the exit to the main Saki-Orlovka highway. When these works are completed, a new asphalt concrete pavement will be installed at the facility, and roadsides will be strengthened.
Recall that in 100 year in Sevastopol, according to the national project «Safe High-Quality Roads», more than 100 objects will be repaired, including 5 bridges.
photo: press service of the Government of Sevastopol
Comments are closed.