Sevastopol investigators are checking information about illegal construction
CrimeaPRESS reports:
On behalf of the head of the Main Investigation Department of the RF Investigative Committee for the Republic of Crimea and the city of Sevastopol, Vladimir Terentyev, a procedural verification of the information voiced on air on the Sevastopol TV channel was organized. This report is about a “problematic issue” for the President of the Russian Federation.
Residents of Admiral Makarov Street reported a dangerous landslide slope: due to the illegal construction of cultural heritage sites in the protected zone (an ensemble of residential buildings and the First Bastion), the soil risks sliding at any moment onto the railway located below, along with historical monuments and a new playground, and The recent hurricane and persistent rains have only made the situation worse. Residents of the Hero City specify that they have repeatedly contacted various departments, but to no avail.— reported in Sledkom.
Investigators of the investigative department for the Nakhimovsky district, as part of an inspection organized under Article 293 of the Criminal Code of the Russian Federation (negligence), were instructed to check the legality of construction and establish the circle of persons responsible for ensuring security in the specified territory.
The progress and results of the audit are under the control of the leadership of the Main Investigation Department of the RF IC for the Republic of Crimea and the city of Sevastopol.
Crimea news | CrimeaPRESS: latest news and main events
Comments are closed.