Sevastopol road workers have begun repairing the pavement on the bridge «Golubinka — Advanced — Shirokoye»
CrimeaPRESS reports:
This year, the program of the national project «Safe High-Quality Roads» in Sevastopol for the first time included two bridges. At one of the sites, road workers have already started repairing the pavement — this is a bridge across the Chernaya River on the section of the Golubinka — Peredovoe — Shirokoe highway. The length of the object is more than 80 meters.
This object is, of course, socially significant. The road leads to the Chernorechensky reservoir and connects all the settlements of the Orlinovsky municipal district with each other. To date, the facility employs 15 workers. The repair of the road bridge will be completed by the end of the year under favorable weather conditions , — the press service of the Government of Sevastopol quotes Alexander Shiryaev, Deputy Director of the Directorate for the Development of Road Transport Infrastructure.
During the repair, workers will install a new barrier and railing along the entire length of the bridge, restore the sidewalk area, and perform waterproofing of the bridge deck — this will ensure the durability and protection of the entire structure from the damaging effects of water. In addition, it is planned to repair the reinforced concrete structures of supports and superstructures with their subsequent painting, to restore drainage pipes.
Recall that in Sevastopol they are also repairing a bridge on the Shirokoe-Ozernoe highway. In addition to two bridge structures, within the framework of the national project «Safe High-Quality Roads» in the 2022 year, 73 roads will be brought to the standard state.
Comments are closed.