The construction of an eco-technopark began in the Saki district
CrimeaPRESS reports:
Within the framework of the national project «Ecology» in the Saki district, an ecotechnopark with a capacity of sorting and processing waste of 200 thousand tons per year is being built.
According to the Ministry of Construction of the Republic of Crimea, the readiness of the facility is 5%. While earthworks are being carried out.
At the current date, work is underway to develop the soil of the pits of the composting site and the weighing site with a checkpoint, the development of pits for the waste sorting building and the administrative and amenity building— noted in the Ministry of Construction and Architecture of the Republic of Crimea.
Ecotechnopark is located in the Suvorovsky rural settlement. The total area of the site is 313 thousand square meters.
The complexes under construction are intended for receiving municipal solid waste, sampling and grinding large-sized materials (waste) from the general MSW flow. As well as sorting, sampling and accumulation of secondary material resources, composting of the organic fraction— said in the Republican Ministry of Construction.
News of the Crimea | CrimeaPRESS
Comments are closed.