They intend to build an eco-technopark in the Leninsky district of the Republic of Crimea
CrimeaPRESS reports:
An eco-technopark with a capacity of 160 thousand tons per year will be built in the Leninsky district. The cost of the project will be about 2.8 billion rubles. The customer for the construction of the facility is an organization subordinate to the Ministry of Construction and Architecture of the Republic of Crimea — the Main Directorate of Capital Construction of the Republic of Crimea.
The new complex will be designed for receiving solid municipal waste, sampling and grinding large materials from the general flow of solid municipal waste, sorting, sampling and accumulation of secondary material resources, composting the organic fraction — “screenings” with accumulation.
On the territory of the technology park it is planned to build a waste sorting complex, an administrative building and a car repair building.
The construction of the eco-technopark will begin as part of the national project “Ecology”. The total development area will be 23.9 thousand km. sq. The contract with the contractor for construction and installation work will be concluded by the end of October. Construction of the facility is scheduled to be completed by the end of 2024.
Let us remind you that within the framework of the national project “Ecology”, two eco-technoparks are already being built in the Republic of Crimea — in the Belogorsky and Saki districts.
According to the press service of the Ministry of Construction of the Republic of Crimea
Crimea news | CrimeaPRESS: latest news and main events
Comments are closed.