Under Sevastopol — at a turn to the backup — equip a new bus stop
Krympress reports:
At the bend to the reserve village, the road is being repaired. Capital repairs are carried out by the Sevastopol Avtodor GBU. To date, the road workers have begun milling of the asphalt concrete coating.
Two public transport stops on both sides of the road fall into the repair zone.
As part of the overhaul, work is planned to bring these bus stops in accordance with regulatory requirements. This means that the contractor will make transition-speed stripes, dismantle the old metal stopping pavilions, equip the sidewalks and landing sites and install two new metal pavilions-such as on the Fiolent,-quoted the press service of the Government of Sevastopol, First Deputy Director of the Department of Transport and Development of Road Transport Infrastructure Nikolai Maximov.
Please note that the dismantling of auto -pavilions with the Panel “Deer” and “Rural Residents” as part of the overhaul is not provided. They will remain untouched.
In the area of new stops, Sevtodor will set lighting, make a pedestrian crossing between them, set traffic lights T7, road signs and a pedestrian fence.
Source: press service of the Government of Sevastopol
Crimea news | Krympress: Latest news and main events
Comments are closed.