In Sevastopol, road workers began repairing Drachuka Street
CrimeaPRESS reports:
As part of the national project “Safe Quality Roads”, work began on Drachuka Street in Sevastopol. The length of the repair area is 400 meters.
As part of the repairs, the contractor at the site will eliminate subsidence, install the base, leveling and top layer of asphalt concrete pavement, and install roadsides.
The road was in unsatisfactory condition, and after diagnosing the road network, a decision was made to repair it. In addition, residents also asked to include this road in the repair plansaid Deputy Director of the Directorate for Development of Road Transport Infrastructure Alexander Shiryaev.
In total, this year 85 roads with a total length of more than 43.6 km will be brought to standard condition, including three bridges with a length of 313 meters.
Detailed information on all repair projects is available at interactive mapwhich clearly demonstrates the progress of work and interim results of the implementation of the national project “Safe Quality Roads”.
Photos and materials: press service of the government of Sevastopol.
Crimea news | CrimeaPRESS: latest news and main events
Comments are closed.